Code Date Venue Fees
OG076 24 - 28 Dec 2017 Dubai - UAE $4,500 Register
OG076 30 Dec - 03 Jan 2019 Dubai - UAE $4,750 Register
Home » Seminars » Maintenance Engineering » Best Practice in Surface Production Operations Management

Introduction

Oil and Gas production in the form of accurate measurement and back-allocating volumes to the wells, efficient production deferment tracking and enhanced integrated production planning process poses a challenge to proper management of an oilfield asset.

In the oilfield, it is a routine practice to carry out these activities (consciously or otherwise) without recognizing and adhering to best practice. Case study indicates that inaccurate measurements of crude oil & gas production represents about 10% revenue lose to an asset with attendant legal consequences or confidence impact in some instance.

Other identified challenges associated with poor management of crude oil production include:

  • Weak deferment administration process
  • Inefficient metering system
  • Poor allocation and reconciliation processes

This naturally cascade into unreliable business planning cycles and field reserve estimation. This training will go steps further to highlight current best industry practice with field experience including challenges and how to mitigate identified challenges. This seminar will further show how an integrated production operations approach is applied in addressing these challenges including custody transfer and other terminal nodes. 

This training seminar will feature:

  • Overview of Surface Production Operations
  • Metering Systems
  • Production Deferment Administration
  • Production Allocation & Reconciliation
  • Integrated Production/Injection Plan

Objectives

The goal of this training seminar will focus on the following objectives:

  • Understand the challenges associated with production operations management
  • Highlight best practice in metering, deferment administration and planning
  • Generate strategy to meet the business-driver in an asset using case study
  • Provide appropriate improvement process

At the end of this training seminar, you will learn to

  • Manage an operating asset with best-in-class practice initiative
  • Understand the best management approach peculiar to your asset
  • Recognize what to watch for in production operations practice
  • Develop asset-specific integrated production plan
  • Develop asset specific metering and deferment framework

Training Methodology

The training will be in a workshop format with strong emphasis on industry best practice alongside an interactive approach from all participants.

Who Should Attend?

This training seminar is suitable to a wide range of professionals but will greatly benefit:

  • Production Operators
  • Field Production Personnel / Supervisors / Superintendents
  • Production Engineers
  • Asset Managers and Senior Managers
  • Asset Support Engineers
  • Process Engineers
  • Reservoir Engineers
  • Planning Engineers
  • Production Accountants/Engineers

Seminar Outline

DAY 1

Overview of Surface Production Operations

  • Introduction to Surface Production Operations
  • Tools Supporting Operations Management
  • Overview of Well, Reservoir & Facility Management (WRFM) process
  • Metering Systems
  • Operations Integration

DAY 2

Production Deferment Administration

  • General Principles of Deferment Administration
  • Measurements
  • Deferment Coding
  • Roles & Responsibilities
  • HCA Applications

DAY 3

Production Allocation & Reconciliation

  • Principles of Production Allocation & Reconciliation
  • Domain Experts & Required Technology
  • Populating and verification/validating process of data
  • Allocation & Reconciliation
  • Standard HCA Business Workflow

DAY 4

Integrated Production/Injection Planning

  • General Principles of Activity Planning
  • Overview of Water-Injection System
  • Business Objective for Integrated Production Planning
  • Common Tools Required
  • Challenges in Integrated Production Plan
  • Integrated Production Plan Workflow
  • Strategy in Generating Robust Plan linked to the Business

DAY 5

Performance Review

  • Case Study
  • General Course Review
  • Assessment of Participants
  • Feedback
  • Closing Remarks

Accreditation

  • Quality Logo

In Association With

PetroKnowledge

PetroKnowledge

Our collaboration with Petroknowledge aims to provide the best training services and benefits for our valued clients

Visit website

You may also be Interested in...

Home » Seminars » Maintenance Engineering » Best Practice in Surface Production Operations Management

© 2017. Material published by GLOMACS shown here is copyrighted.

All rights reserved. Any unauthorized copying, distribution, use, dissemination, downloading, storing (in any medium), transmission, reproduction or reliance in whole or any part of this course outline is prohibited and will constitute an infringement of copyright.

DMCA.com Protection Status

Send to Colleague

© 2017. Material published by GLOMACS shown here is copyrighted.

All rights reserved. Any unauthorized copying, distribution, use, dissemination, downloading, storing (in any medium), transmission, reproduction or reliance in whole or any part of this course outline is prohibited and will constitute an infringement of copyright.





Sending your message. Please wait...

Send Successfully

There was a problem sending your message. Please try again.

Please complete all the fields in the form before sending.

Print Page

© 2017. Material published by GLOMACS shown here is copyrighted.

All rights reserved. Any unauthorized copying, distribution, use, dissemination, downloading, storing (in any medium), transmission, reproduction or reliance in whole or any part of this course outline is prohibited and will constitute an infringement of copyright.






Sending your message. Please wait...

Close

There was a problem sending your message. Please try again.

Please complete all the fields in the form before sending.

Download PDF

© 2017. Material published by GLOMACS shown here is copyrighted.

All rights reserved. Any unauthorized copying, distribution, use, dissemination, downloading, storing (in any medium), transmission, reproduction or reliance in whole or any part of this course outline is prohibited and will constitute an infringement of copyright.






Sending your message. Please wait...

Close

There was a problem sending your message. Please try again.

Please complete all the fields in the form before sending.



Best Practice in Surface Production Operations Management


Upcoming Dates

Code Date Venue Fees
OG076 24 - 28 Dec 2017 Dubai - UAE $4,500
OG076 30 Dec - 03 Jan 2019 Dubai - UAE $4,750

Introduction

Oil and Gas production in the form of accurate measurement and back-allocating volumes to the wells, efficient production deferment tracking and enhanced integrated production planning process poses a challenge to proper management of an oilfield asset.

In the oilfield, it is a routine practice to carry out these activities (consciously or otherwise) without recognizing and adhering to best practice. Case study indicates that inaccurate measurements of crude oil & gas production represents about 10% revenue lose to an asset with attendant legal consequences or confidence impact in some instance.

Other identified challenges associated with poor management of crude oil production include:

  • Weak deferment administration process
  • Inefficient metering system
  • Poor allocation and reconciliation processes

This naturally cascade into unreliable business planning cycles and field reserve estimation. This training will go steps further to highlight current best industry practice with field experience including challenges and how to mitigate identified challenges. This seminar will further show how an integrated production operations approach is applied in addressing these challenges including custody transfer and other terminal nodes. 

This training seminar will feature:

  • Overview of Surface Production Operations
  • Metering Systems
  • Production Deferment Administration
  • Production Allocation & Reconciliation
  • Integrated Production/Injection Plan

Objectives

The goal of this training seminar will focus on the following objectives:

  • Understand the challenges associated with production operations management
  • Highlight best practice in metering, deferment administration and planning
  • Generate strategy to meet the business-driver in an asset using case study
  • Provide appropriate improvement process

At the end of this training seminar, you will learn to

  • Manage an operating asset with best-in-class practice initiative
  • Understand the best management approach peculiar to your asset
  • Recognize what to watch for in production operations practice
  • Develop asset-specific integrated production plan
  • Develop asset specific metering and deferment framework

Training Methodology

The training will be in a workshop format with strong emphasis on industry best practice alongside an interactive approach from all participants.

Who Should Attend?

This training seminar is suitable to a wide range of professionals but will greatly benefit:

  • Production Operators
  • Field Production Personnel / Supervisors / Superintendents
  • Production Engineers
  • Asset Managers and Senior Managers
  • Asset Support Engineers
  • Process Engineers
  • Reservoir Engineers
  • Planning Engineers
  • Production Accountants/Engineers

SEMINAR OUTLINE

DAY 1

Overview of Surface Production Operations

  • Introduction to Surface Production Operations
  • Tools Supporting Operations Management
  • Overview of Well, Reservoir & Facility Management (WRFM) process
  • Metering Systems
  • Operations Integration

DAY 2

Production Deferment Administration

  • General Principles of Deferment Administration
  • Measurements
  • Deferment Coding
  • Roles & Responsibilities
  • HCA Applications

DAY 3

Production Allocation & Reconciliation

  • Principles of Production Allocation & Reconciliation
  • Domain Experts & Required Technology
  • Populating and verification/validating process of data
  • Allocation & Reconciliation
  • Standard HCA Business Workflow

DAY 4

Integrated Production/Injection Planning

  • General Principles of Activity Planning
  • Overview of Water-Injection System
  • Business Objective for Integrated Production Planning
  • Common Tools Required
  • Challenges in Integrated Production Plan
  • Integrated Production Plan Workflow
  • Strategy in Generating Robust Plan linked to the Business

DAY 5

Performance Review

  • Case Study
  • General Course Review
  • Assessment of Participants
  • Feedback
  • Closing Remarks

Quality Logo

GLOMACS is registered with NASBA as a sponsor of Continuing Professional Education (CPE) on the National Registry of CPE Sponsors. NASBA have final authority on the acceptance of individual courses for CPE credit. Complaints regarding registered sponsors may be submitted to the National Registry of CPE Sponsors through its website: www.learningmarket.org.

 

All Training Seminars delivered by GLOMACS by default are eligible for CPE Credit.



© 2017. Material published by GLOMACS shown here is copyrighted.
All rights reserved. Any unauthorized copying, distribution, use, dissemination, downloading, storing (in any medium), transmission, reproduction or reliance in whole or any part of this course outline is prohibited and will constitute an infringement of copyright.

Print Logo
P.O. Box 74653, Dubai, United Arab Emirates
Tel : +971 - 04 - 425 0700, Fax : +971 (04) 425 0701, Email : info@glomacs.ae

Download Training Calendar

Want to stay in touch with what's happening in Glomacs?
Join the conversation on our social media channels:

Facebook Twitter LinkedinYouTube